The following documents are required for the case master plan preparation:
1.A statement of specific topic, relevant exhibition dimensions, and ways of
display for the participating cases in written form (physical and non-physical
case). Physical case should provide the gross construction budget.
2.A conceptual introduction of case master plan
1)To describe the concept of the master plan in written form
2)To describe the preliminary design plan for exhibition in sketch form
3.A master plan in PowerPoint format
All the required documents listed above shall be submitted in electronic
document to the organizer of Shanghai World Expo by January 31st, 2008. The
submitted materials should be in written form either in English or in French.
Note: Physical Cases will be exhibited in the Simulated City Block in
the northern part of the UBPA. Non-Physical Cases will be exhibited in the
Serial Pavilions.